Mayor Vincent C. Gray

Search
DC.gov   DDOT

 

DDOT Logo

District Department of Transportation


Office Hours
Monday through Friday, 8:15 am to 4:45 pm

How to Reach Us
55 M Street, SE, Suite 400
Washington, DC 20003
ddot@dc.gov

Phone: (202) 673-6813
Fax: (202) 671-0650
TTY: (202) 673-6813

FOIA Information
Agency Performance

Website: http://ddot.dc.gov
Blog: http://ddotdish.com

DDOT Facebook  DDOT Twitter  DDOT YouTube  DDOT Flickr  DDOT Scribd 


Terry Bellamy
Director

Ask the Agency

Calendar: Meeting Events
Civil Rights: Equal Opportunity
Contracts: Procurement
DDOT News: Subscribe

 


 
Text Size: A A A Print Friendly Print   Share Share  

St. Elizabeths East 


NOTICE OF AVAILABILITY OF FINDING OF NO SIGNIFICANT IMPACT AND FINAL ENVIRONMENTAL ASSESSMENT FOR THE ST. ELIZABETHS EAST CAMPUS TRANSPORTATION PROJECT

The Federal Highway Administration (FHWA), District of Columbia Division and the District Department of Transportation are announcing the availability of the Finding of No Significant Impact (FONSI) and Final Environmental Assessment for the St. Elizabeths East Campus Transportation Network project, pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C. 4321-4347; the Council on Environmental Quality Regulations (40 CFR parts 1500-1508); and the FHWA Environmental Impact and Related Procedures (23 CFR 771). The Section 106 of the National Historic Preservation Act of 1966 (NHPA) process has also been completed.

SUPPLEMENTARY INFORMATION: The FHWA, in coordination with DDOT, is issuing a FONSI for the Preferred alternative, Alternative 2, as identified in the Final Environmental Assessment for the St. Elizabeths East Campus Transportation Network project. The determination that the proposed undertaking will not have a significant impact on the environment has been made pursuant to the Council on Environmental Quality’s regulations (40 CFR 1500-1508) for implementing the National Environmental Policy Act.

The purpose of the project is to provide a transportation infrastructure network that serves the needs of the redeveloped St. Elizabeths East Campus by providing connectivity and access to adjacent neighborhoods. The needs include the following:

  • Provide connections to the community and neighborhoods
  • Make St. Elizabeths East Campus accessible and open to the community
  • Provide increased transportation connections
  • Make the campus walkable
  • Remove the roadway deficiencies by reconstructing the roadways & connecting the network
  • Provide multimodal transportation options including transit, bikes, and pedestrians
  • Manage the expected growth in travel

As part of FHWA’s NEPA requirements, FHWA & DDOT evaluated the St. Elizabeths East Campus as a historical site to comply with the Section 4(f) of the Department of Transportation Act of 1966 (49 USC303), implemented by 23 CFR 771.135. The Section 4(f) evaluation is included as a chapter of the EA.

Since St. Elizabeths Hospital is a National Historic Landmark, the project also complied with the Section 106 of the National Historic Preservation Act of 1966 (NHPA). FHWA and DDOT consulted with Advisory Council on Historic Preservation (ACHP), DC State Historic Preservation Office (SHPO), and various other consulting parties and an MOA was signed to complete the Section 106 process. A copy of the Sec 106 MOA and the Cultural resources report is also included in the EA.

Hard copies of the FONSI and Final EA may also be viewed at:

  • District Department of Transportation, 55 M Street, SE, 4th Floor, Washington, DC 20003

For more contact information:

  • Federal Highway Administration, District of Columbia Division: Mr. Michael Hicks, 1990 K Street, NW, Suite 510, Washington, DC 20006-1103, (202) 219-3536;
  • District Department of Transportation: Ms. Lezlie Rupert, Project Development & Environment Division, Infrastructure Project Management Administration (IPMA), 55 M Street, SE, Suite 500, Washington DC 20003, (202)-671-1595

 

St. Elizabeths East EA

Project at a Glance

Project Title: St. Elizabeths East
Providing Agency: District Department of Transportation
Office: Infrastructure Project Management Administration (IPMA)
Status: COMPLETED
Type: Renovation/Modernization
Start Date: February 25, 2011
Completed Date: August 14, 2012
Phone: (202) 671-1595

Milestones and Deliverables

St. Elizabeths East:
1: EA Released: January 2, 2012
    for a 30 day comment period
2: Final EA: June 26, 2012
3: FONSI: June 26, 2012

  • Page will open in a new window. The District government has provided links as a courtesy and is not responsible for information on websites outside the DC portal. Inquiries should be made to the sponsoring organizations.

  • [PDF] This document is presented in Portable Document Format (PDF). A PDF reader is required for viewing. Download a PDF Reader or learn more about PDFs.