|
Story at a Glance
The right lane of the northbound 14th Street Bridge will be closed from 8 pm Friday, July 13 through 12 pm Saturday, July 14.
|
Media Contacts
|
(Washington, DC) The right lane of the northbound 14th Street Bridge will be closed from 8 pm Friday, July 13 through 12 pm Saturday, July 14. The closure will start on the Virginia side 200 feet before the Operator’s Tower.
- Motorists entering from northbound GW Parkway will need to merge left almost immediately.
This lane closure will facilitate the concrete encasement of the Pier 14 stem, under the bridge.
All drivers are urged to use extra caution and stay alert.
For more information on the 14th Street Bridge Rehabilitation Project, please visit the DDOT website at ddot.dc.gov.