Mayor Vincent C. Gray

Search
DC.gov   DDOT

 

between and go

DDOT Logo

District Department of Transportation


Office Hours
Monday through Friday, 8:15 am to 4:45 pm

How to Reach Us
55 M Street, SE, Suite 400
Washington, DC 20003
ddot@dc.gov

Phone: (202) 673-6813
Fax: (202) 671-0650
TTY: (202) 673-6813

FOIA Information
Agency Performance

Website: http://ddot.dc.gov
Blog: http://ddotdish.com

DDOT Facebook  DDOT Twitter  DDOT YouTube  DDOT Flickr  DDOT Scribd 


Terry Bellamy
Director

Ask the Agency

Calendar: Meeting Events
Civil Rights: Equal Opportunity
Contracts: Procurement
DDOT News: Subscribe

 


 
Text Size: A A A

July 07, 2012

DDOT Tunnel Maintenance Schedule 

Maintenance activities throughout the Districts tunnel network will be conducted starting Sunday, July 8 through Saturday, August 4; weather permitting.

Story at a Glance 

Share Share   Printer-Friendly Version Print

 

Maintenance activities throughout the Districts tunnel network will be conducted starting Sunday, July 8 through Saturday, August 4; weather permitting.

Media Contacts

(Washington, DC) – The District Department of Transportation (DDOT) will be conducting maintenance activities throughout the Districts tunnel network starting Sunday, July 8 through Saturday, August 4; weather permitting.

The tunnel work will is schedule to occur after the rush hour periods to avoid traffic congestion. Listed below are the locations, date/time and type of closure that will be associated with this maintenance activity.

Location Dates(s) & Time Closures
16th Street, NW under Scott Circle Tunnel 8 pm on Sunday, July 8 to 4 am the following day Tunnel closed
K Street, NW under Washington Circle 8 pm on Monday, July 9 to 4 am the following day Tunnel closed
Massachusetts Avenue, NW under Thomas Circle Tuesday, July 10 10 am – 3 pm Single E/B right lane closures
Mall Tunnel 7 pm on Wednesday, July 11 to 4 am the following day Rotating closures single left lane followed by 2-right lane closures
Massachusetts Avenue, NW under Thomas Circle 8 pm on Thursday, July 12 to 4 am the following day Tunnel closed one direction
Connecticut Avenue, NW under DuPont Circle 8 pm on Thursday, July 12 to 4 am the following day Rotating tunnel closures, N/B then S/B
Barney Circle Ramp 8 pm on Sunday, July 15 to 4 am the following day N/B then S/B single left lane closures
Virginia Avenue, NW under 23rd Street, NW Thursday, July 19 8 pm – 11:30 pm Tunnel closed E/B direction
I-395 N/B ramp under SW Freeway Monday, July 23 8 pm – 12 am Single left lane closure
Mall Tunnel 8 pm on Tuesday, July 24 to 4 am the following day Rotating single left and right lane closures
I-66 White Hurst Freeway 8 pm on Tuesday, July 31 to 4 am the following day N/B and S/B rotating single left lane closures
E Street Expressway 11:30 pm on Wednesday, August 1 to 4 am the following day Single left lane closure
12th Street North & South 8 pm on Wednesday, August 1 to 4 am the following day Single left lane closure
9th Street 8 pm on Friday, August 3 to 4 am the following day Single left lane closure


Variable messages signs will be in place at each location to alert and guide motorists.

DDOT encourages all motorists to stay alert as they approach each work zone.

  • Visit goDCgo.com Page will open in a new window. for more information on transportation options in the District.