Nicholas A. Majett
Director

Ask the Agency


 
Text Size: A A A

August 30, 2012

New Special Inspections Enforcement Program 

DCRA will begin enforcing Chapter 17 of the International Building Code, Special Inspections

Story at a Glance 

Share Share   Printer-Friendly Version Print

 

Under the IBC, special inspection is not a discretionary activity, nor does it replace required structural observations as required by the design professional in responsible charge.

Chapter 17 of the International Building Code, Special Inspections.

special inspections

Effective September 1, 2012, all permits submitted to DCRA that are subject to Chapter 17 (Structural Tests and Special Inspections) of the 2006 edition of the International Building Code (IBC) must comply with the DCRA Special Inspection Program Manual.

  • What are Special Inspections?

Formerly referred to as critical structures, special inspections are the closely coordinated process of design review, construction inspection, and materials testing that includes the Structural Engineer, Contractor, Special Inspector, Testing Agents, Property Owner, and DCRA.

Review of construction documents such as concrete rebar, structural steel erection, and shoring/reshoring shop drawings, as well as testing results for concrete, is a significant part of this process. And, as the name implies, special inspections requires periodic and/or continuous inspection of critical construction elements, such as soils, deep foundations (piles and caissons), concrete structural steel including member connections, and fireproofing performed by an approved Special Inspector. These inspections are highly complex and require specialized expertise that differentiates Special Inspections from conventional compliance inspections.

The District’s formal adoption of this process will put it in line with many other jurisdictions that had adopted the IBC.

  • When are Special Inspections Required?

Special Inspections are not limited only to high-rise buildings or stadiums. In fact, the scope of a Special Inspection may include a small newly-constructed library or a renovated office building. Special Inspections generally are required for any the following design elements:


1. Inspection of fabricators;
2. Structural Steel;
3. Cast in Place Concrete;
4. Precast Concrete (structural);
5. Masonry construction;
5. Wood construction (Heavy Timber or engineered trusses, beams, columns);
6. Soils;
7. Pile foundations (timber, steel, auger cast, helical);
8. Pier foundations (Caissons);
9. Sprayed fire-resistant materials (SFRM);
11. Mastic and intumescent fire-resistant coatings;
12. Exterior insulation and finish systems (EIFS);
13. Special cases;
14. Smoke control; and
15. Tower Cranes (foundation).

However, Special Inspections are not intended for conventional designs such as basic spread footings or stick built or nominal lumber framing. The IBC exempts R-3 occupancy (single family dwellings) from Special Inspections, with the exception of footings located in problem soil areas.

  • What are the Key Steps Prior to Permit Issuance?      

The property owner assembles the design team to handle all things related to Special Inspections. The primary document to prepare is the Statement of Special Inspections which must be included in the building permit application submitted to DCRA.

The Statement of Special Inspections shall include the Owner, the Special Inspector (who must be hired by the owner), the Registered Design Professional in Charge (the Structural Engineer in most cases), the General Contractor, and the Testing Agency.

DCRA will review all construction submittal documents, including the Statement of Special Inspections, to ensure that they comply with Chapter 17 of the IBC.

  • What are Key Steps During Construction and Prior to Certificate of Occupancy?

If Special Inspections are required, the application for a commercial building permit must include a Statement of Special Inspections prepared by the Registered Design Professional in Charge.  
The Statement of Special Inspections must identify: (1) the scope of work subject to Special Inspections; and (2) the frequency of inspections and the name and contact information for the Registered Design Professional in Charge who will be responsible for exercising control over the Special Inspections Program.  

The Statement of Special Inspections will be reviewed by DCRA for approval and acceptance as a condition of the issuance of a commercial building permit.  

Upon issuance of a commercial building permit subject to Special Inspections and prior to the start of any construction, the Registered Design Professional in Charge must contact DCRA to determine whether a pre-construction meeting between DCRA and parties such as the owners, contractors, engineers, and architects will be necessary. If a pre-construction meeting is deemed necessary by DCRA, the pre-construction meeting will be scheduled to discuss the project and all DCRA and IBC procedures related to Special Inspections.


The Contractor is responsible for submitting to DCRA and the property owner a Statement of Contractor Responsibility attesting that they acknowledge the procedures and have adhered to them. Large or complex jobs may require submission of interim reports as construction phases occur to ensure that all work is approved prior to covering.  Smaller or less complex jobs will require submission of the Final Report only.  


Work requiring Special Inspections will be subject to random audits by DCRA. Special Inspectors must complete and maintain daily reports of all work inspected and must provide these records upon request by DCRA.


Upon completion of the work, the Registered Design Professional in Charge identified in the Statement of Special Inspections shall submit a Final Report to DCRA. No final inspection certification will be issued by DCRA or any approved Third Party Agency, nor will any Certificate of Occupancy, whether permanent or temporary, be issued by DCRA until DCRA has approved the Final Report for Special Inspections.

  • Who Pays for Special Inspections?

All fees and costs related to the Special Inspections must be paid by the property owner.

  • Where to find all Special Inspections documents?

See "Related Documents" below.

  • Related Documents